Case Study
Teesside International Airport
Installation of a 30-minute Enviroboard fire wall system within an airport hangar, delivered smoothly through effective coordination and certified workmanship.

Project Overview
FCSL Compliance partnered with MGL Group to deliver the installation of a 30-minute Enviroboard fire wall system within an airport hangar at Teesside International Airport. The works formed part of a build-up fire wall system supplied by an accredited manufacturer, requiring precise installation to ensure full compliance within a critical operational environment.
The Challenge
This project benefited from clear design intent, strong coordination, and well-planned sequencing, allowing works to progress smoothly within the live airport setting without disruption.
Our Solution
FCSL Compliance applied a structured and methodical installation approach, working closely with the project team to ensure the Enviroboard fire wall system was installed in line with manufacturer specifications and certification requirements. Attention to detail and effective communication ensured the programme remained on track throughout.
The Outcome
The fire wall installation was completed successfully, achieving full compliance and certification while supporting risk reduction within the hangar environment. FCSL Compliance delivered a high-quality passive fire protection solution, contributing to the safe operation of this key transport facility.

